| | | | Browse by category |
Article ID: 962
Last updated: 01 Feb, 2008
Problem
Why can't I create a UML diagram without an active project?
Cause
Visual CASE 6.0 requires a project to be loaded to utilized integrated UML diagramming. This limitation may be lifted in future versions of the product.
Action
Why can't I create a UML diagram without an active project?
Cause
Visual CASE 6.0 requires a project to be loaded to utilized integrated UML diagramming. This limitation may be lifted in future versions of the product.
Action
This article was:
Helpful |
Not helpful
Report an issue
Article ID: 962
Last updated: 01 Feb, 2008
Revision: 1
Views: 2404
Posted: 26 Mar, 1999 by
Dean J.
Updated: 01 Feb, 2008 by
Dean J.
Others in this category
Powered by KBPublisher (Knowledge base software)